This weekend Countryside will be looking to move the bridge over the A12 and we have asked if there is any information if residents wish to view the move.
Below is some information if you wish to view the bridge being moved:
“We are planning to commence this weekend, the first move of the RDR3 Bridge over the Great Eastern railway line and the A12 Northbound slip road, onto the temporary trestles.
The bridge will be moved into place by remote controlled Self Propelled Modular Transporters (SMPT’s), which in itself is some engineering feat!!!
This bridge install has created a lot of interest from various parties and therefore we have setup a managed viewing platform for people to attend and observe the site operations.
If you were planning or would like to attend this event, your more than welcome to have access to our viewing platform. However before you do this, we would require you to sign in at the Countryside Strategic Compound and be escorted to the area.
Below is a link to the locations of the viewing platform and the Countryside Strategic Compound;
Strategic Compound; https://w3w.co/relate.shield.brief
Viewing Platform; https://w3w.co/gentle.reds.cross
Key times of the moves are listed below;
Saturday 24th;
- 08:00-12:00 – SPMT movement to take weight of bridge spanning the railway line and A12 carriageway.
- 14:00-16:00 – Move of bridge to site boundary at railway line.
- 16:00-18:00 – Further move of bridge along site boundary and second SPMT movement to take weight of bridge spanning the railway line and A12 carriageway.
Sunday 25th;
- 08:00-11:00 – Move of bridge to align with temporary trestles.
- 12:00-15:00 – Weight transfer of bridge onto temporary trestles.
Please note that the above timings are subject to change.”